Construction Scheduler
BB&E is a full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.
Position Summary
BB&E is currently looking for a Construction Scheduler to support BB&E's A&AS contract, assisting NAVFAC Mid-Atlantic, supporting facilities design and construction projects on-site at Kittery, ME.
Job Duties & Responsibilities
- Assist and provide technical guidance to engineers/architects exercising construction oversight and design management of capital improvements projects; scope of projects is typically complex in nature ranging from comprehensive repairs to unique, multi-million-dollar state-of-the-art construction
- Engage with inter-related construction projects associated with high-visibility program initiatives
- Use design bid-build or design-build project delivery methods
- Manage multiple priorities and, when requested, independently develop and provide technical recommendations/ solutions regarding scheduling issues and time impacts on complex problems encountered during the administration of the construction contracts
- Routinely communicate and coordinate with other technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and the various Field Offices
- Work independently and take required actions through own initiative, using experience and foresight on all assigned projects
- Pre-Construction Award Support
- Provide support during the design phase of projects to ensure an appropriate construction duration is established for major projects or initiatives
- Review scope of individual projects and propose reasonable construction durations to be included in the RFP or solicitation
- Participate in Technical Evaluation Teams (TET) as necessary when selection factors involve the submission of a proposed contractor schedule; review and provide recommendations to the TET Chair
- Post Construction Award Support
- Provide support for schedule requirements on all types and sizes of projects that have encountered schedule slippage; typical duties are associated with modifications, requests for equitable adjustment, and claims.
- Assist field offices in determining if contractor is on schedule
- Review Baseline Schedules and monthly contractor updates to determine validity and conformance to contract requirements
- Assist in validation of impacts to the approved construction schedule
- Review the contractor's TIA proposal and help develop the Government's position regarding delays and/or liability
- Provide analysis on how the contractor can recover, if at all, from current delays to meet the contract completion date
- Develop, maintain, and provide scheduling training to the field office covering basic understanding of network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage
Key Qualifications
- Experience in preparing or analyzing Time-Impact-Analysis as it relates to time extension requests or claims
- Ability to evaluate Contractor's baseline schedules and monthly updates
- Understanding of NAVFAC scheduling requirements and supporting software
- Ability to manage multiple priorities
- Registration as a Planning and Scheduling Professional (PSP) is desirable
- US Citizenship is required
Experience & Education
- A minimum of 7 years of construction scheduling experience utilizing Primavera P6 or its earlier versions is required
- Bachelor's Degree is required
Physical Requirements
- Must be able to remain in a stationary position at least 60% of the time
- Ability to operate office equipment, including computer, copy machine, phone, etc.
- Capable of light lifting, under 10 lbs.
Compensation, Benefits & Perks
- Competitive compensation packages
- Participation in the Employee Stock Ownership Plan - BB&E is 100% employee-owned!
- Discretionary bonus
- Medical, Dental, and Vision Insurance with health care concierge
- *Employer provided Short-Term & Long-Term Disability
- *Employer-provided Life insurance
- *Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits
- *Generous PTO plus 11 paid holidays
- Traditional & Roth 401(k) options with fully vested employer match
- Tuition reimbursement & professional development
- Employee referral program
- Employee discounts
- Employee Assistance Program (EAP)
- Pet insurance discount
*Applies only to full-time employees
*BB&E is an Equal Opportunity Employer and an Affirmative Action Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
